Woodshed is now "fully operational "!

Woodshed


It was cold going,  but I got the third side to the woodshed up!   Now I am thinking of fully enclosing it,  lol!  But,  enclosing it doesn't need to happen before I can use it for wood! 

It looks pretty good in my opinion - especially considering the quick and dirty construction!  The only things I bought were the roofing and the fasteners.  The wood was either fresh milled or reclaimed from inside the old barn.
I am strongly tempted to close the front left bay and put some kind of door on the right side.   Or maybe a door on each side?  In either case, I need to mill more boards!
I am also thinking of putting down some drainage tile in the ditch in front of the shed and covering the tile with blue-stone to at lease the level of lower floor joists.  That way I don't have to worry about snakes and things under the shed biting me when I enter or leave the shed!
 
I didn't quite get all of the wood moved from the shop, but another day should have that done.  I had to leave the farm earlier than I wanted because of an impending snowstorm.  I hope there isn't too much snow left next weekend that I can't get the remaining wood moved!

Not much left to go - but that stuff is hard to get to!  You can kinda see the effects of the collapse on the left there...


Leaves me some good room for shelving and maybe a chop saw station?

Lots of cleaning yet to do, but this is a huge start!


 Auger PTO parts


I damaged my auger a couple weekends ago by not paying attention to what I was doing while using the front forks to move some old rotted wood out of the way of my trail between the garage and the barn.  Lots of hill is in that trail and the auger bottomed out and did not do so well against the frozen ground.  



You can see that the universal joint is broken here and that the yoke is bent out of shape.

There is a square female portion of the PTO drive to the auger under that dirt.



The pieces of the universal are attached to the shaft. 

I went to tractor supply company (TSC) and I think I found the parts I need.  They are close matches anyway.  I should check to make sure that the square shaft fits into the auger drive before I do anything with the universal repair.  The universal repair requires a arbor press which I need to take up to the farm next time.

Sunday, February 8, 2015

Another "all woodshed" weekend

Woodshed progress


I am getting as tired working on this thing as anyone who is reading this is tired of reading this, I bet!

Well, here are some pictures of this past weekends progress:

2 of 3 walls are now up!

I even have the corner "trimmed"

The back wall from the outside. also showing the roof extensions

A better view of the roof extensions.  Added about a foot to the overhang.  I am thinking of building a soffit for extra support and stiffening.

Another view of the inside corner.
Its near done now.  I need to put some roof extensions on the top, but they wont be as hard as the lower extensions (I hope).  The top roof extensions overlap the top of the sheet metal that is already there.  The bottom extensions went underneath the existing sheet metal.

I am considering putting doors on this thing now.  Maybe not right away though.  I need to get the firewood moved and need to get moving on the tree training and trimming (before Spring gets rolling!)

Sunday, February 1, 2015

Bad weather weekend.


Canning Shelf complete?


I stayed at the city house this weekend because weather reports indicated that I may not be able to get in and out of the farm house safely. I am pretty sure I could have,  in retrospect.  Oh well.
This gave me a chance to paint the canning shelves here.   Painting does take a lot of time. 

Safe and sound in its corner.  I still need to add and position the actual shelves.
Slightly different angle.
More shelves in the process of being painted.

I didn't have enough paint to finish painting the last shelf that I had (I had 5 shelves - but I can add more to the unit).   I will go get some paint later.  I am somewhat concerned that the plywood shelves may not be strong enough not to bend under load.  I don't want a shelving collapse with all of my canned goods destroyed!  I may reinforce the plywood by screwing on some angle-iron channel along the sides of each shelf.


Sunday, January 25, 2015

Woodshed continues

Sheesh.   This is taking a long time! 


Got the floor joists milled.   I did 4 oak 2x8's then realized I needed more locust pieces. So I milled more locust 2x7's and 2x4's.  I found more locust logs in my log pile,  thanks goodness!
It took all of Friday  (after I got here, of course) and most of Saturday to mill and install the joists.  I couldn't find any joist hangers for rough lumber so I just used some odd strap like metal pieces I found at home depot.   I had to bend them myself so that took more time.   The ones that I used on the 2x4's had to be trimmed too.

Sunday morning I decided to brace the joists and also end-screwed them in with the 6 inch black lag-screws.  I finally got around to putting floorboards down Sunday afternoon.   I put them on the lower side first since the upper side partially blocks the lower floor. 

lower floor, almost complete
Doing this on diagonal to help distract eye from all the nonparallel/non-perpendicular lines in this shed!
Also, the diagonal is supposedly stronger by having a bracing action on the shed.
Upper floor base acting as a staging location for now

  

Update: Monday - SNOW

 Well. it got cold and snowy overnight.  I stayed Monday so that I could go to the Township meeting at 7:00pm to get my shed permit.  I did some work at home, but couldn't resist working on the shed some - even though it was 20F and snowing...  Anyway, I got the lower floor done and got a good start on the upper floor!  Here are some pics:

Upper floor, not quite half done

Snow makes it a bit tricky!

Finished the floors!


Weather kept me here Tuesday morning and let me finish the floors!  Whew.  Winter weather is here and I still have all that firewood in my shop!  Grrrr

I think they look pretty good!
Could sand these up and put a finish on them!  LOL
I just hope that the floors are strong enough to load with firewood!

Monday, January 19, 2015

More woodshed. Walnut milled!


Mill status


I moved some more of the timber logs from near the house over to the mill-barn.  Moved some heavy ones - those big oak pieces from the big tree I felled in the spring of 2013.   I was barely able to use the front-forks to move one of them - it was just on the edge of tipping!  The other log, the bole, I had to drag.  The ground was frozen so it didn't tear things up too bad.  I have no idea how I am going to load that bole onto the mill!  I might need to halve it with the chainsaw first.  IDK.

After moving some of the outside logs I found that I had several Black Locust logs of a decent size.  This made me consider using locust wood as the base of the floor of my woodshed!  I milled one of the boles  and found that it was somewhat decayed at one end and was only able to get a few 2x4 pieces that where long enough for one side of the woodshed.  I milled another locust log and was able to get 3 2x6's with enough length to provide the basis for the other side of the woodshed floor base.  I have 2 more locust logs that I hope will give me enough wood to put in some floor joists.  Not all of the floor base and joists will touch the ground, so finger crossed that the remaining logs have enough good wood!  The locust, like most of my wood, has been "cured" for at least a year, so its fairly hard. Locust is known for dulling saw blades so I am already seeing that this latest blade is showing signs of "wandering"!  I have been using the water drip for all of my cuts on this blade - I think it does help with the locust.


Walnut, milled!


Chris came over Sunday and we milled the Walnut into mostly 6/4 boards.  He had purchased some AnchorSeal and we painted the ends good with that before and after milling.  Walnut mills very easily, I'm not even sure we needed the water drip, but since this is green wood I wanted to be sure we got no fouling from sap!  Chris and I stickered the wood with some old ash and some pine.  

Chris next to the freshly stickered Walnut boards.  We got about 73 board-ft of mostly 6/4 lumber 


Woodshed progress


As I mentioned above in the "Mill Status" section, I milled some locust for the floor base for the shed.  I wasn't sure about using locust wood in this fashion since I haven't heard of it before.  However, after a search on the internet and talking with John Black, I am convinced I should be using a lot more locust for my building projects!  Locust is hard on the mill blades, but its a very stable wood and otherwise mills quite well.  I will be milling more locust for the floor joists next weekend, I hope.

Woodshed with the floor base installed.  Locust 2x4's on the upper side and 2x6's on the lower.

I should mention that John Black stopped by my place on Saturday and informed me that I should get a permit for the woodshed.  I was a little surprised since I thought that the shed was below their threshold (1500 sq ft I thought), but he said that any building requires one.  It's not really a building permit I guess, but a "land use permit".  It's only $25 so I am not sweating it.  He said the next township meeting was on the 26th and I should go to get the permit then.  I called the old secretary number, but a machine picked up - I left my number and asked for a call back.

John and I got to talking and I learned a lot.  He makes wine too (evidently uses the same recipe book I do!).  We exchanged some of our recent wines.  He gave me a bottle of plum and I gave him a bottle of the concord and a bottle of the pear (I gave him a half-pint of raspberry jam too).   The plum wine was excellent - I think I got the better deal in that trade!  I have 4 plum trees, but they wont be producing plums for a couple years yet.  I will definitely think of making some plum wine when I get some plums!


Tree purchase and plans


I got the new Fulton County Conservation District tree order form for this year.  I am planning on getting some of the Pristine and Liberty apple trees (maybe 3 each?)  Also going to try to raise some strawberries this year!  I have no idea what to do for strawberries, so this should be a learning experience.  Getting 12 more blueberries (2 of each type) and 50 more elderberries to go in the "swampy area" out in the clay field.  I am considering getting 100 black locust seedlings since I don't see a lot of black locust on my property (not that I have looked very closely).  I think I will plant them along the fence line of the hay field.  I need to measure that fence line and see if 100 will be enough.  I also want birch trees eventually, but the conservation district doesn't have them on the form.  I will ask if that is something they will look into carrying.

Just for point of reference, I have already ordered some trees from Willis Orchards.  So far I have (order number: 101027226580)

5
2-3' (Limited Supply) (Ships 11/10/2014 - 04/10/2015)

Jefferson Hazelnut Tree$27.95
5
2-3' (Limited Supply) (Ships 11/10/2014 - 04/10/2015)

Yamhill Hazelnut$27.95
1
1-2' (10 Trees) (Ships 11/10/2014 - 04/10/2015)

Pecan (Native Hardy Seedling)$34.95
5
1-2' (Ships 11/10/2014 - 04/10/2015)

White Walnut Tree$5.95
5
1-2' (Ships 11/10/2014 - 04/10/2015)
Black Walnut Tree$4.95


and (order number: 101348118149)

6
3-4' (Ships 11/10/2014 - 04/10/2015)

Montmorency Cherry Tree$24.95
6
3-4' (Ships 11/10/2014 - 04/10/2015)

Dwarf North Star Cherry Tree$24.95
4
2 Year Old Vine (Ships 11/10/2014 - 04/10/2015)

Pinot Gris Wine Grape Vine$8.95
4
2 Year Old Vine (Ships 11/10/2014 - 04/10/2015)

Sauvignon Blanc Wine Grape Vine$8.95
4
2 Year Old Vine (Ships 11/10/2014 - 04/10/2015)
Zinfandel Wine Grape Vine$8.95

I am still mulling over where to plant all of these.   I think the grapes will go just below the current vines (I need more trellis posts!).  The walnut I will probably plant up along the high field along the wood border.  I am still considering where to plant the  pecans and hazelnuts.  I want the pecans to be somewhat protected, so not along the high wood line!  Maybe below the barn in the wet field area?  The hazel nuts could go in there too - I need to see if its maybe too wet an area for them there.


Monday, January 12, 2015

Woodshed construction in the cold!


Woodshed blitz!


I am hellbent on getting this woodshed up and the firewood OUT of my shop this winter!  With that goal in mind I dared to work in near 0F temps this weekend!  I didn't take as many pictures as I probably should have, but I was busy!


After adding the diagonal bracing to sides and back.   Also added the rafters! 

My book on pole-barns said that these diagonals were very important to pole buildings.  Indeed, I see many small pole buildings falling down or crooked as hell that don't have this bracing.

Pictures for the existing red-barn roof to see spacing information.

Looks like about 3 ft between rafters and 2 ft between purlins


Checking out how the edges of the roof is handled



With purlins added


Also added front and back "girts" to support the additional "center" rafters.

Whew!  With the steel roof on!

Not bad!

The roof is a little askew, but I eyeballed it since it was getting late and I wanted this up because of rain forecast tomorrow morning!




Next morning:  yep, it works!  Freezing rain outside, dry inside!


Next to add the sides and floor!

I wold like to level the floor a bit first - but the ground is frozen hard now.
With regard to the flooring plans, I have considered leveling the floor with dirt, adding stone, and using sleepers, but all of these require a somewhat stable ground, which I don't feel that I have here.  I am afraid that I will be placing in girts at the base and building the floor off of those.  Building the floor off of lower girts cuold eat up about 8"-12" of space from the ground.  Not happy about that - but right now, it looks like the best solution, given the constraints.